Cream production line extension
More details about the project
We have successfully completed a 1,300 square meter cream production floor extension for ICI, a cosmetics manufacturer. The turnkey project included clean room construction, electromechanical systems including HVAC, firefighting, electrical, plumbing systems in addition to metal (fire-rated and hygienic) doors manufactured at our factory .The entire project was executed in compliance with the standards of the Egyptian Drug Authority (EDA).